Difference between revisions of "M13 - Rate Paid (Payroll Report Generator variable)"

From Catalyst
Jump to: navigation, search
(Updated from revision control)
(Updated from revision control)
Line 9: Line 9:
 
;1-52
 
;1-52
 
:A numeric parameter that can be omitted (it defaults to "1").
 
:A numeric parameter that can be omitted (it defaults to "1").
:There are up to 52 weeks in a MPP/APP/PPP - use this parameter to select the week you wish.
+
:There are up to 52 weeks in a MPP/APP/OPPP/ASPP - use this parameter to select the week you wish.
  
 
== Returns ==
 
== Returns ==

Revision as of 03:04, 23 March 2011

Syntax

M13{1-52}

Description

If SMP/SAP/SPP was paid in a particular week then this variable will give you the amount.

Parameters

1-52
A numeric parameter that can be omitted (it defaults to "1").
There are up to 52 weeks in a MPP/APP/OPPP/ASPP - use this parameter to select the week you wish.

Returns

A numeric value whose typical size is 6 digits plus 2 decimal places.