E04 - Material cost (Contract Costings Report Generator variable)

From Catalyst
Revision as of 05:31, 13 July 2019 by ThrashBot (talk | contribs) (Updated from revision control)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Syntax

E04

Description

The cost of the material.

Parameters

None.

Returns

A numeric value whose typical size is 8 digits plus 3 decimal places.