E21 - Task default priority (Personnel Planning Report Generator variable)

From Catalyst
Revision as of 05:37, 21 April 2020 by ThrashBot (talk | contribs) (Updated from revision control)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Syntax

E21

Description

The task default priority of an entered task in " Tasks Outstanding".

Parameters

None.

Returns

A numeric value whose typical size is 2 digits.