Difference between revisions of "How do I Make Job Planning Refresh Automatically?"
From Catalyst
Katy Kitchen (talk | contribs) (→More Information) |
Katy Kitchen (talk | contribs) (→More Information) |
||
Line 8: | Line 8: | ||
* Click {{Button|OK}} then {{Button|Done}} and {{Button|Accept}} to save the changes. | * Click {{Button|OK}} then {{Button|Done}} and {{Button|Accept}} to save the changes. | ||
− | {{Tip|text=Entering {{DataValue|0}} here will disable this feature. To force a | + | {{Tip|text=Entering {{DataValue|0}} here will disable this feature. To force a refresh click {{Button|Search}} within the planning screen.}} |
== See also == | == See also == |
Latest revision as of 12:19, 15 January 2024
Summary
The following article explains how to make the Job Planning screen refresh automatically.
More Information
Go to " Reports & Settings Maintenance Options System Administrator Platinum Settings" and search for 'regather'.
- Select "Regather planning view (Seconds)" and click [Edit].
- The screen will auto refresh based on the number of seconds entered here up to a maximum of 999 seconds).
- Click [OK] then [Done] and [Accept] to save the changes.
Entering '0' here will disable this feature. To force a refresh click [Search] within the planning screen. |
See also
- How do I configure my logistics planning?
- How do I Change my Job Entry Prompts?
- Viewing current logistics jobs