P02 - Task priority (Personnel Planning Report Generator variable)

From Catalyst
Revision as of 05:37, 16 April 2020 by ThrashBot (talk | contribs) (Updated from revision control)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Syntax

P02{C/O}

Description

The priority attached to the current task.

Parameters

C/O
A text parameter that can be omitted (it defaults to "C").
C
Gives the current priority, calculated from the System parameters and the current User Date.
O
Gives the Task's original assigned priority.

Returns

A numeric value whose typical size is 8 digits.