P09 - Task type (Personnel Planning Report Generator variable)

From Catalyst
Jump to: navigation, search

Syntax

P09{C/E}

Description

The type code given to the current task.

Parameters

C/E
A text parameter that can be omitted (it defaults to "C").
C
Gives the type code for the task.
E
Gives the type code when the task was first created.

Returns

A text value whose typical size is 3 characters.